Welcome to today's Architectural Review Board meeting. 00:00:11
Today is Tuesday, July 9th, 2024. Can we get a? 00:00:18
Roll call please. 00:00:26
Vice Chair. 00:00:29
Here. 00:00:30
Member Huff. Member Brooks here. 00:00:32
And Chair Bornstein and member Sutphin are absent today. 00:00:37
Thank you. 00:00:43
Thank you. And item 2 is approval of the agenda. My understanding is that item. 00:00:46
8C is being continued. 00:00:55
Is that? 00:01:00
Continue to the next meeting. 00:01:02
OK. 00:01:10
Yes, that's correct. OK. 00:01:11
So that would we would just need to approve the agenda with that. 00:01:17
Modification. 00:01:24
And we get A roll call vote. 00:01:28
I moved. 00:01:33
Books. 00:01:35
Aye, member Huff. 00:01:38
And Vice Chair Boyle. 00:01:42
Three eyes, 0 nays. Motion passes. 00:01:44
Hey, great. And item three, do we have any board and or staff announcements? 00:01:49
OK, seeing none, we can close item 3 and go to Council Liaison Announcements. 00:02:03
Good afternoon Vice Chair Boyle and Commissioners. The only thing I have today is last week City Council meeting. 00:02:12
Council voted for two in favor of submitting a ballot. City of Pacific Grove submitting a ballot measure to the voters to amend 00:02:19
the Pacific Grove City Charter to change the number of elected City Council members from six to four and related changes to the 00:02:26
city charter as well. So that was approved and that will be going to the ballot. Thank you and have a great meeting. 00:02:33
Thank you for that. Item 5 is general public comment. At this time, we can invite members of the public to speak. These comments 00:02:41
would be items that are not related to our agenda today. And if anybody would like to come up to the podium, who's in? 00:02:52
In the chambers, you're welcome to or raise your hand. 00:03:05
We'll give each speaker 3 minutes. 00:03:11
I don't see any hands raised. Thank you. Seeing none, we will close general public comment and we have nothing on the consent 00:03:20
agenda. So we'll go to our regular agenda Item 8A architectural permit and tree permit with development. 00:03:30
Architectural permit is APN 007-592-022-O. That's the APN number. I apologize. 00:03:42
Architectural Permit. Entry permit with development permit #23-0007 for 1015 Hillside Ave. Do we have a staff report? 00:03:54
Yes, we do. 00:04:08
One second here. 00:04:10
Good afternoon Vice Chair Boyle and board members. The proposed project is located at 1015 Hillside Ave. This was presented at the 00:04:18
July 11th, 2023 regular meeting of the Architectural Review Board. 00:04:25
Upon consideration, the ARB found the proposed project did not conform to Architectural Review Guidelines 12243234 and 35 relating 00:04:33
to height, massing, scale and neighbors privacy. They are be requested a redesign with the primary focus on scale and neighboring 00:04:41
privacy. That the applicant has made revisions based on the ARB comments and proposed a project that involves construction of a 00:04:50
new two-story residence with an attached garage. 00:04:58
And removal of six coast Live Oak trees and two Monterey pine trees. 00:05:06
The 4500 square foot lot is located West of Patterson Lane in an area of medium to large one to two-story single family residences 00:05:16
in the Del Monte Park neighborhood and R1 zoning district. The lot is currently vacant but was once occupied by a one story single 00:05:24
family home that was demolished by a fallen tree in 2018. The property is not located in an archaeological zone, coastal zone, or 00:05:31
area of biological significance. 00:05:39
As proposed, the project includes construction of a 2350 square foot, two-story residence with an attached 264 square foot garage. 00:05:52
The project would also include an open porch above the garage and a second story deck on the front facade. As proposed, the 00:05:59
project complies with zoning regulations and development standards set forth in Pacific Grove Municipal Code Chapter 23.16, R One 00:06:06
District. 00:06:13
This includes, but is not limited to building coverage, site coverage, floor area, setbacks, building height, and off street 00:06:20
parking. 00:06:25
A tree permit with development is required because the project proposes to remove a total of 8 trees on the property. According to 00:06:33
Certified Arborist Brian Bradford's Tree Removal Assessment and Planning Management, which is included in your packet, 2 Monterey 00:06:40
Pines have been declared hazardous. 00:06:46
And six coast Live Oak trees will need to be removed for construction. 00:06:53
Tree removal and pruning activities are subject to standards and requirements of Chapter 12 in PGM Pacific Grove Municipal Code 00:06:58
and per section 12.20, Point 070. Removal. Removal of any protected tree on a property that will continue to meet the canopy goals 00:07:06
after the removal shall not require replacement. 00:07:13
In this case, the available landscape area for the subject property is 2921 square feet. Therefore, the required canopy coverage 00:07:21
goals for the property is 2 upper canopy trees and three lower canopy trees. 00:07:28
After development, the property will have 3 upper canopy trees and four lower canopy trees. Therefore, the canopy coverage goal is 00:07:36
met and no trees are proposed to be planted. 00:07:41
Protection measures from Bradford's management plan have been included as a condition of approval in the draft permit. 00:07:48
This elevation This elevation shows the proposed project from the north elevation. 00:07:58
And this elevation shows the proposed Street View in scale with the neighboring residences looking N from Hillside Ave. 00:08:09
Staff recommends the Architectural Review Board approve the architectural permit and tree permit with development 23-0007, subject 00:08:24
to the findings, conditions of approval and Section 15303. A Class 3 new construction or conversion of small structures 00:08:32
categorical exemption. Thank you. I'm available for any questions you may have. 00:08:40
Thank you for that report. Do we have the applicant or architect who would like to? 00:08:49
Speak. Thank you. 00:08:59
I will give you 10 minutes. 00:09:03
The city guidelines and the neighbors comments and we've incorporated as requested the last Planning Commission meeting I. 00:09:25
Similar features to the neighborhood. We've matched the roof types, the wall finish types, the driveway entrances, the stairways. 00:09:36
Everything is very similar to the neighborhood, adjacent neighborhood houses. 00:09:46
We've also met and exceeded all the zoning City of Pacific Grove zoning standards. 00:09:58
Thank you. 00:10:06
Thank you. We may have questions later, so we'll call you. Thanks. 00:10:07
Are there any members of the public that care to speak to this project? 00:10:12
The next speaker will be Inga Lorenzen Dahmer. 00:10:23
Welcome. Thank you, Chair and members. 00:10:29
I had written you a letter. I didn't check to see if it had been published, but I am going to assume you all read it. And my 00:10:33
request was with the tree. One thing they didn't incorporate from the excellent arborist report, and I really that was a pretty 00:10:41
good arborist report. I mean, I'm impressed. 00:10:49
But in #3 tree #280 and 3584, the arborist suggested, because of its proximity to the proposed structure and to the proposed 00:10:58
driveway, that any trenching or excavation near where the large roots may be encountered should be observed by a certified 00:11:08
arborist. And those are specific requests for just the two trees. 00:11:19
That certainly he didn't put into any other report that I've seen, and I have seen how bad trenching has damaged tree roots and 00:11:30
killed a tree. So I would request that in addition. 00:11:39
To your quote, UN quote, you know six or five standard ones that are down there, which is what staff put into the report. I would 00:11:49
request that the trenching. 00:11:55
Observation by a certified arborist for those two trees be added to conditions. 00:12:02
Thank you very much. Thank you. 00:12:14
Next speaker will be Lisa Ciani. 00:12:24
Welcome. Thank you. Excuse me. 00:12:29
I would like to second English comments. 00:12:33
And say that it was. 00:12:39
So great to to read. 00:12:42
A an arborist report that really paid close attention to the protections needed. 00:12:46
By by Pacific Grove Trees, we don't see that all the time. So I, I hope that you would ask to have those two conditions added. 00:12:54
Thank you. 00:13:00
Thank you. 00:13:08
I see no other hands raised. 00:13:14
Great. OK, seeing no other comments, we will close public comment and bring it back to the board. 00:13:20
Anybody. 00:13:27
Happy, happy to start conference here. 00:13:30
I thought the the plans were very nice. They comply with all the regulations. I appreciated the fact that the massing was reduced. 00:13:35
By setting the second story back so I have no problem with the plans and had no points there my only. 00:13:45
Comment was to actually echo Miss Gianni and Miss Dahmer and and actually enhance that. 00:13:52
Comment go a bit further when I read through the. 00:14:00
The arborist report, which I agree was very detailed and very informative and helpful. On pages two and three, the arborist goes 00:14:05
through the. 00:14:11
6 trees to be retained and they're actually a number number of recommendations for each tree not just in 280 and 3584 and I 00:14:18
thought all those recommendations were great and. 00:14:25
I would propose conditioning approval. 00:14:33
That all of those recommendations be. 00:14:39
Be made so for instance, you know on 286 the. 00:14:42
The, the vine should be cleared and yeah, the vine should be removed and then on 285, the exposed route should be covered with a 00:14:50
thick uniform layer of soil. And so the, the report outlines it, but I, I didn't see that in the actual protection measures. And 00:14:58
so my suggestion again would be to ensure that all of those recommendations for each of those six trees be. 00:15:06
Be added to the conditions for approval. 00:15:16
That was it. Great. 00:15:20
OK. Did you have any comments? 00:15:21
Appropriate for the particular site, Umm. 00:15:28
I my guess my question would be for staff with regard to the conditions for approval that are proposed here with regard to the the 00:15:32
arborist observation, is that something that actually is within our? 00:15:38
Authority to impose. 00:15:45
You can add that as a condition of approval. 00:15:50
OK. Then I have, I have no objection to this project or supporting a motion that included that as a condition. I wanted to say 00:15:52
thank you so much to the applicant because I know that this is the third time around and this has been years in the making. I so 00:16:00
appreciate. 00:16:07
That you guys haven't given up? 00:16:17
It's a it's a totally different home than it was originally. 00:16:21
And I just want to say I mean to me this is when the process has. 00:16:29
Really worked because. 00:16:36
I think this is a really beautiful. 00:16:41
A beautiful project. 00:16:47
And I mean, you changed the roof from the parapet to the Gable roof. The deck is still there, but it's recessed in and I, I just 00:16:49
really feel like. 00:16:56
I just. 00:17:04
I just want to thank you for listening and implementing and I know it wasn't easy, it's been a year so. 00:17:05
I'm just really, I couldn't be more happy. So I just wanted to say thank you. I I really do think it's a beautiful. 00:17:15
Project. I did have one question about the stone and maybe you might come up to the podium if you don't mind. 00:17:27
My question was if this. 00:17:37
Stone veneer? No, sorry. Let's see where it was. 00:17:45
I want to say it was ecostone. 00:17:53
Is that a thin stone veneer or is that a manufactured veneer? Stone veneer? 00:17:57
It's a thin stone. OK, so it's natural stone. 00:18:02
Yes, it is OK. Make sure to note on there that it should be natural stone. OK. I just I was just curious it's you know, we have 00:18:07
such with so much moisture in the soil up there, you're going to get a fluorescing if it is an if it is not a natural stone 00:18:15
veneer, which wouldn't be pretty for the neighborhood. So I just wanted to make sure. And again, I went back and this morning and 00:18:22
listened to our testimony from a year ago and. 00:18:30
Just again, thank you. Thank you. Thanks. That's all. Those are all my comments. So, so we can entertain a motion. I agree with 00:18:39
the conditions of approval being added to somebody wants to sure. 00:18:48
I'll move to approve the architectural permit and tree permit with development AP TPD 230007 subject to the recommended finding 00:18:58
findings conditions of approval, which should add that. 00:19:04
All of the recommendations on pages two and three of the Arborist Report regarding the six trees to be remain to to be retained, 00:19:12
to be implemented, and a. 00:19:20
Condition for approval. 00:19:29
2nd. 00:19:32
Can we get A roll call vote? 00:19:34
Member Brooks Aye. 00:19:37
Member Huff. 00:19:41
By his chair, Boyle. 00:19:44
Three eyes, 0 nays. Motion passes. Thank you. 00:19:46
Item 8B Architectural permit and tree permit with development 24-0071. The address is 418 Grove Acre Ave. Do we have a staff 00:20:02
report? 00:20:10
Good afternoon vice Chair Boyle and board members. The project is located at 418 Grove Acre Ave. 00:20:26
Excuse me, a little Pacific Grove Acres neighborhood. 00:20:34
The 13,964 square foot interior lot is located on the West side of Grove Maker Ave. between Pico Ave. and Dennis St. in an area of 00:20:42
medium to large one story single family residences in the R1B3 Zone district. The lot is currently developed with A1 story single 00:20:50
family residence with an attached garage totaling 1733 square feet. 00:20:59
As proposed, the project total for the dimension of the existing structure, removal of eight trees and construction of will 00:21:10
stories in the family residence with an attached garage workshop totaled 3100 and 33930 square feet. As designed, the project 00:21:17
would confirm with all applicable development regulations. 00:21:24
And this elevation shows the proposed view from Grove Acre Ave. 00:21:34
And staff recommends the Architectural Review Board approach the Architectural Plumbing and Trooper with development subject to 00:21:43
the findings conditions of approval in a Class 2 categorical exemption. And this concludes staff's presentation and staff is 00:21:50
available for questions and the applicant is also present to answer questions. 00:21:57
Great. Thank you for your report. Does the. 00:22:06
Applicant or architect care to give a presentation? 00:22:10
Good afternoon, Jeannie Byrne. I'm the architect on this project. 00:22:18
Umm the owners, when they started the project wanted to maintain a single fair, a single story residence, which I think is very 00:22:22
much in keeping with the neighborhood. One of the objectives was to bring the house further forward, to eliminate some of the 00:22:32
extensive paving that was there for the original house. So it also opens up their backyard so that there's a. 00:22:41
More open, usable space. I think if you look at the arborist report, all of the trees that are scheduled to be taken at the 00:22:51
Monterey Pines are in serious condition. 00:22:57
Some have already gone down. 00:23:03
There was a question about the oak that's at the corner. 00:23:07
It is misshapen. 00:23:12
For better word, the growth pattern is 11 feet out towards the back from the trunk of the tree. So it really in order to miss that 00:23:16
tree would seriously impact the location of the house. So we felt and I think the arborist agreed with us that a new tree. 00:23:28
In a better location was more appropriate. 00:23:41
The style is simple. 00:23:45
Sort of a contemporary Craftsman genre. 00:23:49
And I think the owners have done a great job of of wanting to fit in with the neighborhood and and use vernacular materials and. 00:23:55
The stone accents will be a natural thin set and really if you have any questions, I'd be happy to answer them. Thank you for that 00:24:07
report. 00:24:14
Are there any members of the public that care to speak to this project? 00:24:23
See. No hands raised. 00:24:35
OK, I just wanted to give it another second just in case. 00:24:42
OK. 00:24:48
We will go ahead and close public comment and bring it back to the board. 00:24:51
Would anybody care to go first? 00:24:59
Happy do I? 00:25:02
As we are very well accustomed to seeing with Miss Burn and her designs, I think they're stunning and and very lovely and I 00:25:07
thought the plan said is. 00:25:12
Was great I had, I fully support it. The only question I had that I think again Miss Byrne addressed and what they spoke to was 00:25:20
the one public comment that I saw discussing that Live Oak and. 00:25:28
So I don't know what further conversation is there if it's not. 00:25:38
Feasible to keep that oak? 00:25:43
With the current design then that that makes sense to me and I understand. So that would be the only thing I would invite further 00:25:46
discussion on and and I guess clarity on on whether that whether it's possible for that out to be retained. If it's not, then I, I 00:25:52
support approving the the tree permit. 00:25:57
I have nothing further. 00:26:04
You want to go sure I. 00:26:06
Challenging a lot with the trees the way they are, I understand the necessity for removing them. I see condition #11 calls for 00:26:09
their replacement and otherwise I thought the design was great. Certainly fitting fits the neighborhood will definitely result in 00:26:15
a beautification of the lot. I completely support the project. 00:26:21
Great. And I just wanted to say to the. 00:26:28
Applicant that you know, thank you for not over building and I think this is going to fit in really well with with the 00:26:32
neighborhood. Obviously they could have gone up and chose not to and you know, we appreciate that. I think the design is is 00:26:40
beautiful. 00:26:47
And I think reducing some of the. 00:26:55
The paving is a is a great a great thing to get our soils more permeable and. 00:27:01
All that stuff and then the back area of that property is going to be a wonderful place to replant the replacement trees. 00:27:08
Those are my only comments. I think we can probably look at a. 00:27:18
Motion. 00:27:24
I move to approve the project. 00:27:27
2nd. 00:27:30
We get A roll call vote. 00:27:31
Member of US. 00:27:34
Member Brooks. Hi Eric Boyle. Hi, We have 3R0 nays motion passes. Thank you. Thank you. 00:27:36
We have no continued or ongoing business. No new business. Our next meeting will be August 13th. It's 3/28. Meeting is adjourned. 00:27:50
Link
Start video at
Social
Embed

* you need to log in to manage your favorites

My Favorites List
You haven't added any favorites yet. Click the "Add Favorite" button on any media page, and they'll show up here.
Welcome to today's Architectural Review Board meeting. 00:00:11
Today is Tuesday, July 9th, 2024. Can we get a? 00:00:18
Roll call please. 00:00:26
Vice Chair. 00:00:29
Here. 00:00:30
Member Huff. Member Brooks here. 00:00:32
And Chair Bornstein and member Sutphin are absent today. 00:00:37
Thank you. 00:00:43
Thank you. And item 2 is approval of the agenda. My understanding is that item. 00:00:46
8C is being continued. 00:00:55
Is that? 00:01:00
Continue to the next meeting. 00:01:02
OK. 00:01:10
Yes, that's correct. OK. 00:01:11
So that would we would just need to approve the agenda with that. 00:01:17
Modification. 00:01:24
And we get A roll call vote. 00:01:28
I moved. 00:01:33
Books. 00:01:35
Aye, member Huff. 00:01:38
And Vice Chair Boyle. 00:01:42
Three eyes, 0 nays. Motion passes. 00:01:44
Hey, great. And item three, do we have any board and or staff announcements? 00:01:49
OK, seeing none, we can close item 3 and go to Council Liaison Announcements. 00:02:03
Good afternoon Vice Chair Boyle and Commissioners. The only thing I have today is last week City Council meeting. 00:02:12
Council voted for two in favor of submitting a ballot. City of Pacific Grove submitting a ballot measure to the voters to amend 00:02:19
the Pacific Grove City Charter to change the number of elected City Council members from six to four and related changes to the 00:02:26
city charter as well. So that was approved and that will be going to the ballot. Thank you and have a great meeting. 00:02:33
Thank you for that. Item 5 is general public comment. At this time, we can invite members of the public to speak. These comments 00:02:41
would be items that are not related to our agenda today. And if anybody would like to come up to the podium, who's in? 00:02:52
In the chambers, you're welcome to or raise your hand. 00:03:05
We'll give each speaker 3 minutes. 00:03:11
I don't see any hands raised. Thank you. Seeing none, we will close general public comment and we have nothing on the consent 00:03:20
agenda. So we'll go to our regular agenda Item 8A architectural permit and tree permit with development. 00:03:30
Architectural permit is APN 007-592-022-O. That's the APN number. I apologize. 00:03:42
Architectural Permit. Entry permit with development permit #23-0007 for 1015 Hillside Ave. Do we have a staff report? 00:03:54
Yes, we do. 00:04:08
One second here. 00:04:10
Good afternoon Vice Chair Boyle and board members. The proposed project is located at 1015 Hillside Ave. This was presented at the 00:04:18
July 11th, 2023 regular meeting of the Architectural Review Board. 00:04:25
Upon consideration, the ARB found the proposed project did not conform to Architectural Review Guidelines 12243234 and 35 relating 00:04:33
to height, massing, scale and neighbors privacy. They are be requested a redesign with the primary focus on scale and neighboring 00:04:41
privacy. That the applicant has made revisions based on the ARB comments and proposed a project that involves construction of a 00:04:50
new two-story residence with an attached garage. 00:04:58
And removal of six coast Live Oak trees and two Monterey pine trees. 00:05:06
The 4500 square foot lot is located West of Patterson Lane in an area of medium to large one to two-story single family residences 00:05:16
in the Del Monte Park neighborhood and R1 zoning district. The lot is currently vacant but was once occupied by a one story single 00:05:24
family home that was demolished by a fallen tree in 2018. The property is not located in an archaeological zone, coastal zone, or 00:05:31
area of biological significance. 00:05:39
As proposed, the project includes construction of a 2350 square foot, two-story residence with an attached 264 square foot garage. 00:05:52
The project would also include an open porch above the garage and a second story deck on the front facade. As proposed, the 00:05:59
project complies with zoning regulations and development standards set forth in Pacific Grove Municipal Code Chapter 23.16, R One 00:06:06
District. 00:06:13
This includes, but is not limited to building coverage, site coverage, floor area, setbacks, building height, and off street 00:06:20
parking. 00:06:25
A tree permit with development is required because the project proposes to remove a total of 8 trees on the property. According to 00:06:33
Certified Arborist Brian Bradford's Tree Removal Assessment and Planning Management, which is included in your packet, 2 Monterey 00:06:40
Pines have been declared hazardous. 00:06:46
And six coast Live Oak trees will need to be removed for construction. 00:06:53
Tree removal and pruning activities are subject to standards and requirements of Chapter 12 in PGM Pacific Grove Municipal Code 00:06:58
and per section 12.20, Point 070. Removal. Removal of any protected tree on a property that will continue to meet the canopy goals 00:07:06
after the removal shall not require replacement. 00:07:13
In this case, the available landscape area for the subject property is 2921 square feet. Therefore, the required canopy coverage 00:07:21
goals for the property is 2 upper canopy trees and three lower canopy trees. 00:07:28
After development, the property will have 3 upper canopy trees and four lower canopy trees. Therefore, the canopy coverage goal is 00:07:36
met and no trees are proposed to be planted. 00:07:41
Protection measures from Bradford's management plan have been included as a condition of approval in the draft permit. 00:07:48
This elevation This elevation shows the proposed project from the north elevation. 00:07:58
And this elevation shows the proposed Street View in scale with the neighboring residences looking N from Hillside Ave. 00:08:09
Staff recommends the Architectural Review Board approve the architectural permit and tree permit with development 23-0007, subject 00:08:24
to the findings, conditions of approval and Section 15303. A Class 3 new construction or conversion of small structures 00:08:32
categorical exemption. Thank you. I'm available for any questions you may have. 00:08:40
Thank you for that report. Do we have the applicant or architect who would like to? 00:08:49
Speak. Thank you. 00:08:59
I will give you 10 minutes. 00:09:03
The city guidelines and the neighbors comments and we've incorporated as requested the last Planning Commission meeting I. 00:09:25
Similar features to the neighborhood. We've matched the roof types, the wall finish types, the driveway entrances, the stairways. 00:09:36
Everything is very similar to the neighborhood, adjacent neighborhood houses. 00:09:46
We've also met and exceeded all the zoning City of Pacific Grove zoning standards. 00:09:58
Thank you. 00:10:06
Thank you. We may have questions later, so we'll call you. Thanks. 00:10:07
Are there any members of the public that care to speak to this project? 00:10:12
The next speaker will be Inga Lorenzen Dahmer. 00:10:23
Welcome. Thank you, Chair and members. 00:10:29
I had written you a letter. I didn't check to see if it had been published, but I am going to assume you all read it. And my 00:10:33
request was with the tree. One thing they didn't incorporate from the excellent arborist report, and I really that was a pretty 00:10:41
good arborist report. I mean, I'm impressed. 00:10:49
But in #3 tree #280 and 3584, the arborist suggested, because of its proximity to the proposed structure and to the proposed 00:10:58
driveway, that any trenching or excavation near where the large roots may be encountered should be observed by a certified 00:11:08
arborist. And those are specific requests for just the two trees. 00:11:19
That certainly he didn't put into any other report that I've seen, and I have seen how bad trenching has damaged tree roots and 00:11:30
killed a tree. So I would request that in addition. 00:11:39
To your quote, UN quote, you know six or five standard ones that are down there, which is what staff put into the report. I would 00:11:49
request that the trenching. 00:11:55
Observation by a certified arborist for those two trees be added to conditions. 00:12:02
Thank you very much. Thank you. 00:12:14
Next speaker will be Lisa Ciani. 00:12:24
Welcome. Thank you. Excuse me. 00:12:29
I would like to second English comments. 00:12:33
And say that it was. 00:12:39
So great to to read. 00:12:42
A an arborist report that really paid close attention to the protections needed. 00:12:46
By by Pacific Grove Trees, we don't see that all the time. So I, I hope that you would ask to have those two conditions added. 00:12:54
Thank you. 00:13:00
Thank you. 00:13:08
I see no other hands raised. 00:13:14
Great. OK, seeing no other comments, we will close public comment and bring it back to the board. 00:13:20
Anybody. 00:13:27
Happy, happy to start conference here. 00:13:30
I thought the the plans were very nice. They comply with all the regulations. I appreciated the fact that the massing was reduced. 00:13:35
By setting the second story back so I have no problem with the plans and had no points there my only. 00:13:45
Comment was to actually echo Miss Gianni and Miss Dahmer and and actually enhance that. 00:13:52
Comment go a bit further when I read through the. 00:14:00
The arborist report, which I agree was very detailed and very informative and helpful. On pages two and three, the arborist goes 00:14:05
through the. 00:14:11
6 trees to be retained and they're actually a number number of recommendations for each tree not just in 280 and 3584 and I 00:14:18
thought all those recommendations were great and. 00:14:25
I would propose conditioning approval. 00:14:33
That all of those recommendations be. 00:14:39
Be made so for instance, you know on 286 the. 00:14:42
The, the vine should be cleared and yeah, the vine should be removed and then on 285, the exposed route should be covered with a 00:14:50
thick uniform layer of soil. And so the, the report outlines it, but I, I didn't see that in the actual protection measures. And 00:14:58
so my suggestion again would be to ensure that all of those recommendations for each of those six trees be. 00:15:06
Be added to the conditions for approval. 00:15:16
That was it. Great. 00:15:20
OK. Did you have any comments? 00:15:21
Appropriate for the particular site, Umm. 00:15:28
I my guess my question would be for staff with regard to the conditions for approval that are proposed here with regard to the the 00:15:32
arborist observation, is that something that actually is within our? 00:15:38
Authority to impose. 00:15:45
You can add that as a condition of approval. 00:15:50
OK. Then I have, I have no objection to this project or supporting a motion that included that as a condition. I wanted to say 00:15:52
thank you so much to the applicant because I know that this is the third time around and this has been years in the making. I so 00:16:00
appreciate. 00:16:07
That you guys haven't given up? 00:16:17
It's a it's a totally different home than it was originally. 00:16:21
And I just want to say I mean to me this is when the process has. 00:16:29
Really worked because. 00:16:36
I think this is a really beautiful. 00:16:41
A beautiful project. 00:16:47
And I mean, you changed the roof from the parapet to the Gable roof. The deck is still there, but it's recessed in and I, I just 00:16:49
really feel like. 00:16:56
I just. 00:17:04
I just want to thank you for listening and implementing and I know it wasn't easy, it's been a year so. 00:17:05
I'm just really, I couldn't be more happy. So I just wanted to say thank you. I I really do think it's a beautiful. 00:17:15
Project. I did have one question about the stone and maybe you might come up to the podium if you don't mind. 00:17:27
My question was if this. 00:17:37
Stone veneer? No, sorry. Let's see where it was. 00:17:45
I want to say it was ecostone. 00:17:53
Is that a thin stone veneer or is that a manufactured veneer? Stone veneer? 00:17:57
It's a thin stone. OK, so it's natural stone. 00:18:02
Yes, it is OK. Make sure to note on there that it should be natural stone. OK. I just I was just curious it's you know, we have 00:18:07
such with so much moisture in the soil up there, you're going to get a fluorescing if it is an if it is not a natural stone 00:18:15
veneer, which wouldn't be pretty for the neighborhood. So I just wanted to make sure. And again, I went back and this morning and 00:18:22
listened to our testimony from a year ago and. 00:18:30
Just again, thank you. Thank you. Thanks. That's all. Those are all my comments. So, so we can entertain a motion. I agree with 00:18:39
the conditions of approval being added to somebody wants to sure. 00:18:48
I'll move to approve the architectural permit and tree permit with development AP TPD 230007 subject to the recommended finding 00:18:58
findings conditions of approval, which should add that. 00:19:04
All of the recommendations on pages two and three of the Arborist Report regarding the six trees to be remain to to be retained, 00:19:12
to be implemented, and a. 00:19:20
Condition for approval. 00:19:29
2nd. 00:19:32
Can we get A roll call vote? 00:19:34
Member Brooks Aye. 00:19:37
Member Huff. 00:19:41
By his chair, Boyle. 00:19:44
Three eyes, 0 nays. Motion passes. Thank you. 00:19:46
Item 8B Architectural permit and tree permit with development 24-0071. The address is 418 Grove Acre Ave. Do we have a staff 00:20:02
report? 00:20:10
Good afternoon vice Chair Boyle and board members. The project is located at 418 Grove Acre Ave. 00:20:26
Excuse me, a little Pacific Grove Acres neighborhood. 00:20:34
The 13,964 square foot interior lot is located on the West side of Grove Maker Ave. between Pico Ave. and Dennis St. in an area of 00:20:42
medium to large one story single family residences in the R1B3 Zone district. The lot is currently developed with A1 story single 00:20:50
family residence with an attached garage totaling 1733 square feet. 00:20:59
As proposed, the project total for the dimension of the existing structure, removal of eight trees and construction of will 00:21:10
stories in the family residence with an attached garage workshop totaled 3100 and 33930 square feet. As designed, the project 00:21:17
would confirm with all applicable development regulations. 00:21:24
And this elevation shows the proposed view from Grove Acre Ave. 00:21:34
And staff recommends the Architectural Review Board approach the Architectural Plumbing and Trooper with development subject to 00:21:43
the findings conditions of approval in a Class 2 categorical exemption. And this concludes staff's presentation and staff is 00:21:50
available for questions and the applicant is also present to answer questions. 00:21:57
Great. Thank you for your report. Does the. 00:22:06
Applicant or architect care to give a presentation? 00:22:10
Good afternoon, Jeannie Byrne. I'm the architect on this project. 00:22:18
Umm the owners, when they started the project wanted to maintain a single fair, a single story residence, which I think is very 00:22:22
much in keeping with the neighborhood. One of the objectives was to bring the house further forward, to eliminate some of the 00:22:32
extensive paving that was there for the original house. So it also opens up their backyard so that there's a. 00:22:41
More open, usable space. I think if you look at the arborist report, all of the trees that are scheduled to be taken at the 00:22:51
Monterey Pines are in serious condition. 00:22:57
Some have already gone down. 00:23:03
There was a question about the oak that's at the corner. 00:23:07
It is misshapen. 00:23:12
For better word, the growth pattern is 11 feet out towards the back from the trunk of the tree. So it really in order to miss that 00:23:16
tree would seriously impact the location of the house. So we felt and I think the arborist agreed with us that a new tree. 00:23:28
In a better location was more appropriate. 00:23:41
The style is simple. 00:23:45
Sort of a contemporary Craftsman genre. 00:23:49
And I think the owners have done a great job of of wanting to fit in with the neighborhood and and use vernacular materials and. 00:23:55
The stone accents will be a natural thin set and really if you have any questions, I'd be happy to answer them. Thank you for that 00:24:07
report. 00:24:14
Are there any members of the public that care to speak to this project? 00:24:23
See. No hands raised. 00:24:35
OK, I just wanted to give it another second just in case. 00:24:42
OK. 00:24:48
We will go ahead and close public comment and bring it back to the board. 00:24:51
Would anybody care to go first? 00:24:59
Happy do I? 00:25:02
As we are very well accustomed to seeing with Miss Burn and her designs, I think they're stunning and and very lovely and I 00:25:07
thought the plan said is. 00:25:12
Was great I had, I fully support it. The only question I had that I think again Miss Byrne addressed and what they spoke to was 00:25:20
the one public comment that I saw discussing that Live Oak and. 00:25:28
So I don't know what further conversation is there if it's not. 00:25:38
Feasible to keep that oak? 00:25:43
With the current design then that that makes sense to me and I understand. So that would be the only thing I would invite further 00:25:46
discussion on and and I guess clarity on on whether that whether it's possible for that out to be retained. If it's not, then I, I 00:25:52
support approving the the tree permit. 00:25:57
I have nothing further. 00:26:04
You want to go sure I. 00:26:06
Challenging a lot with the trees the way they are, I understand the necessity for removing them. I see condition #11 calls for 00:26:09
their replacement and otherwise I thought the design was great. Certainly fitting fits the neighborhood will definitely result in 00:26:15
a beautification of the lot. I completely support the project. 00:26:21
Great. And I just wanted to say to the. 00:26:28
Applicant that you know, thank you for not over building and I think this is going to fit in really well with with the 00:26:32
neighborhood. Obviously they could have gone up and chose not to and you know, we appreciate that. I think the design is is 00:26:40
beautiful. 00:26:47
And I think reducing some of the. 00:26:55
The paving is a is a great a great thing to get our soils more permeable and. 00:27:01
All that stuff and then the back area of that property is going to be a wonderful place to replant the replacement trees. 00:27:08
Those are my only comments. I think we can probably look at a. 00:27:18
Motion. 00:27:24
I move to approve the project. 00:27:27
2nd. 00:27:30
We get A roll call vote. 00:27:31
Member of US. 00:27:34
Member Brooks. Hi Eric Boyle. Hi, We have 3R0 nays motion passes. Thank you. Thank you. 00:27:36
We have no continued or ongoing business. No new business. Our next meeting will be August 13th. It's 3/28. Meeting is adjourned. 00:27:50